CALL NOW01724 514344

Entrance lobby plastering around two doorways

Fresh plaster finishes the lobby around its two existing doorways.

  • 3 photos

What needed doing

The entrance lobby needed a plaster finish around the glazed front entrance and the internal door. Before work, the photos show areas of exposed blockwork and unfinished edges, with the ceiling framing still visible. The two doorways leave narrow sections of wall that are easier to see from opposite ends of the lobby.

Fresh plaster on the lobby walls beside the glazed entrance Full photo
Fresh skim: front glazing

What we did

  1. We plastered the wall areas around the glazed entrance and internal door. Working around the existing openings meant following their edges as well as covering the wider wall sections.

  2. The gallery shows how the plaster finishes against the door surrounds. Look at the view beside the internal door to compare its unfinished edge with the fresh skim.

The result

The finished photos show the newly plastered surfaces from both ends of the lobby. The doorways give you a fixed point for comparing how the wall finish changed in a small space.

Project stages

See the finished photo
Unfinished lobby wall beside the internal door Full photo
Before: internal door
Freshly skimmed wall around the internal lobby door Full photo
Fresh skim: internal door

Planning similar work?

Send us a photo from each end of your lobby if it needs plastering. Point out which surfaces are bare and whether the door frames are staying. If the ceiling needs work as well, include it in a separate photo so we can discuss it when pricing the job.

Check our service areas
Email us for a quote

The email draft includes this project and a space for your postcode.

Call 01724 514344