CALL NOW01724 514344

Kitchen and utility plasterboarding and skimming

Fresh skim finishes the areas around the black back door and adjoining kitchen opening.

  • 6 photos

What needed doing

The kitchen and utility needed fresh finishes around two existing openings. The early photos show exposed studs and blockwork close to the back door and the opening between the rooms. Those are useful reference points because you can spot both of them again at each stage.

Freshly skimmed walls around the opening between the kitchen and utility Full photo
Fresh skim: kitchen opening

What we did

  1. We boarded the pictured wall sections, including the area beside the black back door and around the opening to the kitchen. The middle photographs show the boards in position before plastering.

  2. We skimmed the boarded areas in the kitchen and utility. The finish follows the edges of both openings and continues onto the adjoining wall faces.

The result

The later photographs show fresh plaster on each side of the job. The back-door view reveals the short section beside the frame, while the kitchen view shows the finish carrying through to the opening between the rooms.

Project stages

See the finished photo
Exposed studs and blockwork before boarding the kitchen and utility Full photo
Before: studs and blockwork
Unfinished wall beside the utility back door Full photo
Before: back door
New plasterboard around the utility back door Full photo
Plasterboard: back door
New plasterboard around the opening to the kitchen Full photo
Plasterboard: kitchen opening
Fresh plaster beside the utility back door Full photo
Fresh skim: back door

Planning similar work?

If your refit includes an adjoining utility, tell us which surfaces need work in each room and when fittings are due to go in. A photo either side of the connecting doorway helps us identify where the plastering needs to carry through.

Check our service areas
Email us for a quote

The email draft includes this project and a space for your postcode.

Call 01724 514344