Bathroom wall plastering in Scunthorpe
The exposed upper bathroom walls were left with a smooth plaster finish above the retained tiles.
- Scunthorpe · DN15
- Project length 1-2 days
- 1 photo
What needed doing
This Scunthorpe bathroom needed fresh plaster on the exposed upper wall sections above the white tiles. The plastering also took in the wall around the small window at the far end of the room.
In a narrow bathroom like this one, the line between the new plaster and the existing tiles is easy to see from the doorway. That line and the edges by the window show where the work was carried out.

What we did
We prepared the exposed wall surfaces above the retained tiles.
We applied a smooth skim to those sections, finishing the edges next to the tiles and around the small window. The photo shows how the new plaster sits against both features.
The result
The upper walls had a smooth finish for the next stage of the renovation once the plaster dried. The photo shows which parts of the wall were skimmed and where the original tiled sections meet them.
Planning similar work?
If your bathroom is being updated, let us know which tiles you plan to keep, where you want a painted finish and which areas will be tiled. Include a photo of the exposed wall sections so we can discuss the plastering and when it fits into your renovation.
Check our service areasThe email draft includes this project and a space for your postcode.
Call 01724 514344


