Bathroom wall plastering in Scunthorpe

The exposed upper bathroom walls were left with a smooth plaster finish above the retained tiles.

  • Scunthorpe · DN15
  • Project length 1-2 days
  • 1 photo

What needed doing

This Scunthorpe bathroom needed fresh plaster on the exposed upper wall sections above the white tiles. The plastering also took in the wall around the small window at the far end of the room.

In a narrow bathroom like this one, the line between the new plaster and the existing tiles is easy to see from the doorway. That line and the edges by the window show where the work was carried out.

Fresh plaster on the upper walls of a narrow bathroom with white tiles and a small window Full photo
Fresh wall plaster above the existing tiles

What we did

  1. We prepared the exposed wall surfaces above the retained tiles.

  2. We applied a smooth skim to those sections, finishing the edges next to the tiles and around the small window. The photo shows how the new plaster sits against both features.

The result

The upper walls had a smooth finish for the next stage of the renovation once the plaster dried. The photo shows which parts of the wall were skimmed and where the original tiled sections meet them.

Planning similar work?

If your bathroom is being updated, let us know which tiles you plan to keep, where you want a painted finish and which areas will be tiled. Include a photo of the exposed wall sections so we can discuss the plastering and when it fits into your renovation.

Check our service areas
Email us for a quote

The email draft includes this project and a space for your postcode.